En raison des congés annuels, notre entreprise sera fermée du vendredi, 15 mai, 2026 to vendredi, 22 mai 2026

depuis plus de 25 ans
qualité garantie
retrait et livraison express
assistance téléphonique:
0511 / 67 66 97 0

Suzuki Uz125 Service Manual !!install!! Page

The CVT belt should be inspected every service and typically requires replacement between 24,000 and 28,000 km. Key Maintenance Procedures

Understanding your scooter’s baseline performance and physical dimensions is the first step in effective maintenance. Specification F468/Forced Air-cooled, 4-stroke, Single Cylinder, SOHC Displacement Fuel System Fuel Injection (FI) Maximum Output ~8.7 to 9.9 ps @ 7,500 rpm (depending on model year) Oil Capacity ~1.0L Engine Oil / 100ml Gear Oil Fuel Tank 5.6 to 6.0 Liters Recommended Maintenance Schedule Suzuki Uz125 Service Manual

500–750 km (or 1 month). This is the most critical service where engine parts seat together; it involves oil replacement and fastener tightening. Regular Service: Every 5,000–6,000 km or 6 months. The CVT belt should be inspected every service

Every 12,000 km. This includes checking the spark plug, air filter, and CVT system. This is the most critical service where engine